Older PROJECT

Pre-Feasibility Study for the Maros Regency Water Supply ProjectThe Pre-Feasibility study for the Kabupaten Maros PPP Water Supply Project

MADEP’s portfolio records this 2009 assignment for National Development Planning Agency (Bappenas). Its documented field of specialization is Survey, Study.

The Maros pre-feasibility study concerns a water-supply project. At this early stage, the planning question is whether the proposed service and investment warrant more detailed preparation, especially given local utility and financing constraints.

The World Bank describes the funding and institutional challenges facing Indonesian local water utilities during 1999–2010.

Water-supply preparation requires attention to utility capacity, financing and the service expected from an investment. The World Bank roadmap describes sector constraints of the period, not the conclusion of the Maros pre-feasibility study.

Key Areas: Survey | Study

Context source: World Bank, Indonesia water-sector roadmap. The assignment identity, year, client and specialization come from MADEP’s portfolio record. The linked publication provides sector context, not independent verification of MADEP-specific outcomes.